Channel System Horizontal Fixing

Profilli Yatay Bağlantı

Installation Types – Channel System Horizontal Fixing

  • L Anchors, the main load of the bearing system, should be connected to the concrete elements of the building with Steel Anchhors.
  • Before the installation of the L Anchor, the insulation material should be cut to the size of the “L Anchor”.
  • After installing L Anchors, Channels must be replaced according to the dimension of the stone and the installation type. Hexagon Head Bolts must be used during the installation process of the Channels to the L Anchors.
  • With the profiles installed, types of Anchors and Adjustable Arms should be selected according to the deadweight of the stone and the installation type.

Profilli Yatay Bağlantı